PERT Calculator (Three-Point Estimate)

Compute the PERT expected value and confidence ranges from your optimistic, most likely, and pessimistic estimates. A fast, weighted three-point estimate for any task or project.

From a quick estimate to a real decision

PERT gives you a single weighted estimate and a standard deviation for one task. That is genuinely useful - but it assumes a tidy, symmetric spread and treats the task in isolation. Real projects have dozens of tasks whose risks pile up and interact.

The natural next step is a Monte Carlo simulation, which samples the full range thousands of times. Incertive does this across your entire plan and returns a probability of hitting your deadline or budget, not just a point estimate.

AI can describe your risk. Incertive calculates it.

This calculator gives you one estimate. Incertive runs thousands of Monte Carlo scenarios on your actual plan - success probability, sensitivity analysis, and a Go/No-Go you can defend, reproducibly, the same way every time.

Evaluate My Project

Frequently asked questions

What is the PERT estimate formula?

PERT (Program Evaluation and Review Technique) computes the expected value as (Optimistic + 4 x Most Likely + Pessimistic) / 6. The 4x weight on the most likely value makes it a weighted average that leans toward the realistic case while still accounting for both extremes. The standard deviation is (Pessimistic - Optimistic) / 6.

How is PERT different from a simple three-point average?

A simple average is (O + M + P) / 3, which treats all three points equally. PERT weights the most likely value four times as heavily, producing a more realistic estimate that is less swung by an extreme optimistic or pessimistic figure. PERT also gives you a standard deviation, so you can state confidence ranges, not just a single number.

What do the confidence ranges mean?

Assuming a roughly normal distribution around the PERT estimate, about 68% of outcomes fall within one standard deviation (Estimate +/- 1 SD) and about 95% within two (Estimate +/- 2 SD). So the +/- 2 SD range is a reasonable "almost certainly between" band you can commit to.

When should I use PERT versus Monte Carlo?

PERT is a fast, single-task estimate with a clean formula. Use it for a quick read on one activity. When a project has many tasks whose risks interact, a Monte Carlo simulation samples the whole model thousands of times and shows the true distribution - use our Monte Carlo calculator or Incertive for that.

Can AI give me a PERT estimate?

AI can recite the formula, but it will not consistently apply it to your numbers, and it returns a different answer each time. This calculator computes it exactly and shows the confidence ranges. Incertive goes further, turning three-point estimates across your whole plan into a probability of hitting your deadline or budget.